1. 500kV Datka-Kemin Transmission Line and Substations.
Project Cost: USD 190 million
US Export Potential: USD 103 million
US companies can potentially export the equipment (from automatic circuit breakers to power transformers) and services (from electrical designs to environmental assessments).
Description: This project incorporates construction of 500kV Datka – Kemin Transmission Line, 400 km with 500kV / 220kV Kemin Substation (Figure 2.) Government of Kyrgyzstan defined this project to connect generation in the south to demand in the north of the country. Additionally this project includes construction of
a substation that will integrate the planned Kambarata Hydropower Plant to the 500kV electrical grid.

2. Southern Kyrgyzstan Transmission Upgrade Project
Project Cost: USD 55 million
US Export Potential: USD 40 million
US companies can potentially export the equipment (from automatic circuit breakers to power transformers) and services (from electrical designs to environmental assessments).
Description: The project incorporates the construction of a 500/220kV substation at Datka with interconnection to the existing 500kV O/H Transmission Line and the construction and replacement of several 220kV transmission lines old and in need of rehabilitation. Benefits of this project include relief of current overloading (25-30% during winter high demand), self-sufficiency of supply and control of the Southern Transmission system. Additionally there would be a better and more efficient transmission and increased reliability of service to many southern towns which are often left without electricity during winter.